|
|
|
|
|
|
|
|
|
|
|
|
|
The
nominal load model
|
|
|
|
was
made to match as
|
|
|
|
closely
as possible the
|
|
|
|
background
traffic seen
|
|
|
|
during
a maritime exercise
|
|
|
|
(in
is towards the
|
|
|
maritime
node)
|
|
|
|
The
high load model is
|
|
|
|
based
on the assumption of
|
|
|
increased
traffic at times of
|
|
|
increased
activity.
|
|
|
|