 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
n |
VERY
different country rules:
|
|
|
|
– |
US:
finalise spectrum options by Q3 2001, prior to licensing 3G systems by
|
|
|
Q4
2002. consultation process completed 30 March 2001 with reports from
|
|
|
FCC
and NTIA.
|
|
|
|
– |
Canada
auctioned PCS spectrum in January 2001 that can be used for 3G
|
|
|
services,
with 52 licences attracting bids totalling $1.48 billion.
|
|
|
|
– |
Spectrum
policy in USA and Canada is today not service specific. This means
|
|
that
any licensee can deploy 3G systems in their existing spectrum, if
|
|
|
equipment
exists for that particular spectrum.
|
|
|
|
– |
France:
4 National licenses, beauty contest plus fixed cost. First two licences
|
|
|
awarded
to Itineris (France Telecom) and SFR (Cegetel). Conditions have yet
|
|
|
to be
set for the award of two further licences. First licences awarded
|
|
|
31.05.01.
Date of second call for tender not yet confirmed
|
|
|
|
– |
Germany:
6 National licences awarded, five 2x10 + 5 MHz, one 2x10 MHz.
|
|
|
1st
stage auction completed (17.8.00), raising DM98.8 billion. Second stage
|
|
|
closed
18.8.00, awarding an additional 1x5Mhz unpaired to all except one.
|
|